These load shedding schedules will be implemented on a rotating bases starting with the group in the timeslot as per schedule as soon as a request is received from eskom. load shedding can occur as stage 1, stage 2 or stage 3 request.. Load shedding status we are currently not load shedding due to high demand or urgent maintenance being performed at certain power stations. to determine the time/s that you will be affected, please view the schedule for your area.. Eskom indicated that it is planning changes to the current load shedding programme. these changes include the standardisation of schedules in relation to stages and load shedding times. this new requirements will have to be incorporated in a new schedule for tshwane. residents should please note that the revised schedule is an interim measure..
The load shedding started from 17:00 until 20:00. the power provider said it required a capacity saving of 600 megawatts. this is as a result of eskom not being able to generate the required capacity due to industrial action that affected them. tshwane metro published the following load shedding schedule: tshwane is on standby for stage 2 load. Htxt.africa is one of south africa�s leading technology news and reviews sites, catering for consumers, small and medium businesses and the technology channel. we publish original content daily.
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.